Moving

traditional_kampong_house_rumah_melayu_move_heritage_moving.jpg

The MNP Architecture page’s [that's us] dojo is in the process of moving [actual physical location, not sites]. As a result, I’m not sure how posting will work out for the next week or so. That said, we’ve got a lot lined up for the month of September here at AMNP – be sure to check back often.

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>