Moving

traditional_kampong_house_rumah_melayu_move_heritage_moving.jpg

The MNP Architecture page’s [that's us] dojo is in the process of moving [actual physical location, not sites]. As a result, I’m not sure how posting will work out for the next week or so. That said, we’ve got a lot lined up for the month of September here at AMNP – be sure to check back often.

Posted: August 29th, 2008
at 1:51pm by orangemenace


Categories: MNP

Comments: 2 comments



 

Leave a Reply